Power to sub-panels may be diverted by larger beakers found in buildings with a higher capacity. Used to control a specific aspect of the house, these sub-panels will have its own set of breakers.
With the building main service panel, a ground wire is always installed for safety reasons. This metal wire runs to a metal rod driven into the ground from the neutral connector located within the panel.