Visit Publisher Site

Oil palm composting and granulation production line equipment configuration

Share on Facebook   Share on Twitter
(0 Reviews)
Raw material preparation stage

Wheel Loader Feeding Hopper: Used for loading and initial storage of raw materials.
Cage Crusher (especially urea mill) : If urea needs to be added, use this device for grinding.
Posted on 07/29/24

Featured Websites







Copyright © 2020 Linkz